From readiness to controlled production — fail-closed by design
Onboarding takes a signed customer to verified production without ever letting a deployment go live before its owner-gated controls are actually satisfied. A blocked gate never reads as passed.
Readiness assessment
Architecture, identity, knowledge readiness, security requirements and the operational use case.
Deployment planning
Customer-specific architecture, environment and integration plan.
Identity validation
Live enterprise-identity (Entra / OIDC) login validated in your tenant.
Connector validation
SharePoint / ServiceNow / filesystem connectors validated against your instances.
Knowledge onboarding
Approved knowledge ingested, classified and governed into packs.
Customer golden set
A telecom-SME golden evaluation set authored for your environment.
Assurance run
A customer-specific assurance evaluation must pass before operational use.
Go-live review
Mandatory gates checked; restore drill recorded; go-live approval captured.
Controlled production activation
Production activation is refused while any mandatory gate is unresolved — fail-closed.
Managed review
Recurring governed reviews begin; renewal is evidenced by signed reports.
Ten mandatory gates must be satisfied before production: live Entra login, SharePoint and ServiceNow validation (where in scope), HA / failover validation, container & OS image scan, external penetration test (or accepted risk), an approved telecom-SME golden set, a passed customer assurance run, a recorded restore drill, and go-live approval.
Start with a readiness assessment.
A fixed-scope engagement that produces your deployment recommendation and pilot plan.